This Fencing (Colorbond & Pool) SWMS (Safe Work Method Statement) is pre-filled and covers installing Colorbond and pool fencing, including footings, concrete, posts and panels. It covers 14 activities, from arriving at site to keeping the pool barrier safe during the works, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Fencing contractors
Pool builders and pool fence installers
Landscapers who install boundary and pool fencing
Builders and handymen on residential jobs
Aluminium pool fence installers
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Arriving at site, including vehicles, plant and uneven ground
UV exposure and sunburn
Unloading and setting up equipment, including falls from the vehicle and manual handling
Marking out the fence line, including services and heat stress
Excavating footing pads, including services, excavation collapse and silica dust
Mixing concrete, including cement splashes, electric mixers and unguarded moving parts
Alkaline burns and dermatitis from wet concrete, mortar and cement
Installing posts and panels, including nail gun injuries and sharp Colorbond edges
Cleaning the work area, housekeeping and concrete washout
Keeping the pool barrier secure so a young child can't reach the pool during the works
Post-work inspection and handover of the finished fence
Emergency response to electric shock, fire, structural failure or injury
What's included
Hazards and control measures for 14 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, including augers, mini excavators, concrete mixers and nail guns
Materials such as Colorbond panels, posts and concrete mix, plus daily pre-start checks and training
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for Colorbond and pool fencing?
A SWMS is legally required when the job is high risk construction work, for example digging near buried gas mains or electrical services, excavating deeper than 1.5 metres, or working where a mini excavator is moving. Outside those situations it isn't mandatory, but you still have to manage the risks, and a SWMS is a sound way to record how. Builders and prequalification portals often ask for one either way.
Does it cover pool barrier safety during the works?
Yes. It covers the risk of a young child reaching the pool through a gap in the barrier during the works, at a break or overnight, and handing over a finished barrier that doesn't comply.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















