This Slab (Preparation, Pouring & Finishing) SWMS (Safe Work Method Statement) is pre-filled and covers preparing, pouring and finishing concrete slabs, from formwork and steel to placing and trowelling. It covers 21 activities, from arriving on site to saw cutting and concrete line blockages, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Concreters and concrete finishers
Builders and slab contractors
Formworkers and steel fixers
Concrete pumping and placing boom contractors
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Arriving on site, unloading and setting up equipment
Pegs, edge boards and formwork installation, including nail gun injuries
Benching and fill with plant movement, dust and sunburn
Laying plastic and carrying, cutting, placing and tying steel
Electrical leads and portable tools, especially in wet conditions
Angle grinder and oxy acetylene use, including burns, sparks and fire
Placing the concrete boom, including tip over in wind and electricity
Placing concrete, hopper spray and burst delivery lines
Alkaline burns and dermatitis from wet concrete and cement
Screeding, power trowelling and saw cutting, with silica dust and vibration
Clearing concrete line blockages and releasing pressure safely
Response to injuries, incidents and damaged equipment
What's included
Hazards and control measures for 21 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, from concrete pump and placing boom to power trowel and H class vacuum
Qualifications, including white card, licensed pump operators and a dogger for suspended loads
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for preparing, pouring and finishing a slab?
A SWMS is legally required when the job is high risk construction work, for example where powered mobile plant like a concrete pump or agitator is moving, near energised overhead power lines, or next to a road in use. Outside those situations a SWMS isn't mandatory, but you still have to manage the risks, and a SWMS is a sound way to record how. Clients, head contractors and prequalification portals often ask for one either way.
Does it cover concrete line blockages?
Yes. It covers being struck by concrete or a whipping line when a blocked line is opened under pressure, couplings or clamps released under pressure, and alkaline burns from concrete spray.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.