This Window Installation & Replacement SWMS (Safe Work Method Statement) is pre-filled and covers removing old windows and fitting new glass, frames and architraves. It sets out 18 activities, from site setup and scaffold setup to clean up and signing out, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Window and door installers
Glaziers and glass replacement businesses
Builders and carpenters fitting windows on renovations
Aluminium and timber window suppliers who install
Home renovation and maintenance contractors
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Site setup, protecting floors and furniture, and vehicle risks
Communication on site and working around other trades
Emergency medical preparedness and access to a casualty
Scaffold setup and dismantling, falls and falling objects
Handling sharp, damaged and suction-lifted glass
Housekeeping during glass installation
Power tool use, flying fragments and moving parts
Removing old windows, with cuts, debris, electrocution and manual handling
Preparing the opening and fitting the new window, including sealants and fatigue
Fitting timber architraves and working with glue
Carrying equipment from the roof or worksite
Clean up, signing out of site and incident response
What's included
Hazards and control measures for 18 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, including suction lifters, scaffolding and RCD protected 240V tools
Qualifications, including the white card and working at heights or high risk work licences where needed
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for window installation?
A SWMS is legally required when the job is high risk construction work, for example fitting windows where someone could fall more than 2 metres, working near energised electrical installations, or in an area where powered mobile plant is moving. Outside those situations a SWMS isn't mandatory, but you still have to manage the risks, and a SWMS is a sound way to record how. Builders, head contractors and prequalification portals often ask for one either way.
Does it cover suction lifters?
Yes. The glass handling activity covers glass slipping from suction lifters, along with cuts from sharp or damaged glass, dropped panels, eye injuries from fragments and manual handling strain.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















