A blank Safe Work Method Statement in the same format as our ready-to-use SWMS. Set out the job steps, the hazards and how each risk will be controlled, with a high risk construction work checklist, risk matrix, worker sign-off and step-by-step instructions. Editable in Microsoft Word.

★★★★★
Trusted by 15,000+ Australian businesses
since 2008

The free Everything OHS Safe Work Method Statement (SWMS) template in Word, with project and business details, sign-off, PPE checklist and plant and materials

WHEN YOU NEED ONE

When you'll be asked for a SWMS

Most businesses need a SWMS because someone asks for one before the work can go ahead. Legally, a SWMS is only required for high risk construction work. Outside that, it's one of the most widely used formats for planning a job and showing how you'll manage its risks, so clients, head contractors and tender forms ask for it whatever the work is.

Tenders and prequalification

A tender, council contract, Avetta or Cm3 submission asks for SWMS for the work you do.

Before you start on site

A principal contractor or head contractor wants your SWMS before you can start.

Client requests, any industry

Cleaning, gardening, maintenance, hospitality or transport work, where the client asks for a SWMS by name.

Planning a higher risk task

Any job with serious risks, where you want the steps and controls written down and the crew signed on.

High risk construction work

The one case where the law requires a SWMS. It must be prepared before the work starts. See the list below.

When the law requires a SWMS

The WHS Regulations list 18 types of high risk construction work. If any one of them applies to the job, a SWMS must be prepared before the work starts. The free template includes this checklist, so you can tick what applies.

1. Risk of a person falling more than 2 metres

 

2. Work on a telecommunication tower

 

3. Demolition of a load-bearing element of a structure

 

4. Work likely to involve disturbing asbestos

 

5. Structural alterations or repairs that need temporary support to prevent collapse

 

6. Work in or near a confined space

 

7. Work in or near a shaft or trench deeper than 1.5 metres, or a tunnel

 

8. Use of explosives

 

9. Work on or near pressurised gas mains or piping

10. Work on or near chemical, fuel or refrigerant lines

 

11. Work on or near energised electrical installations or services

 

12. Work in an area that may have a contaminated or flammable atmosphere

 

13. Tilt-up or precast concrete elements

 

14. Work on, in or next to a road, railway, shipping lane or other traffic corridor in use

 

15. Work in an area with movement of powered mobile plant

 

16. Work in areas with artificial extremes of temperature

 

17. Work in or near water or other liquid with a risk of drowning

 

18. Diving work

Victoria: the OHS Regulations 2017 have their own list of high risk construction work (reg 322) and their own SWMS requirements (reg 327). Duty holders are employers and self-employed persons.

South Australia: since 1 July 2026, the fall trigger is more than 2 metres, in line with the other model WHS states. SA previously used more than 3 metres.

Not on the list? You may still need a SWMS because a client or contractor asks for it. Every business has to manage the risks of its work, and a SWMS is a clear way to show how you're doing it.

Testing, maintenance and repair work of a minor nature isn't construction work, so it doesn't trigger the SWMS duty on its own. Fall risk must still be managed at any height.

WHAT THE LAW EXPECTS

What a SWMS must include

  • The high risk construction work involved

  • The hazards and risks of that work

  • The control measures for those risks

  • How the controls will be put in place, monitored and reviewed

It must be written so the workers using it can understand it, and prepared with the workers who do the job (and your HSR if you have one). The work must then follow the SWMS. If it doesn't, stop the work as soon as it's safe to, and only restart when it complies.

Keep the SWMS until the work is finished. If a notifiable incident happens during that work, keep it for at least 2 years.

WHAT'S IN THE TEMPLATE

Everything a SWMS needs, ready to fill in

Business and job details

Project, site, principal contractor, prepared and reviewed by.

PPE, plant and licences

PPE checklist, plant and equipment, materials, SDS, licences and training.

High risk construction work checklist

All 18 categories, ready to tick.

Job steps table

Steps, hazards, risk before and after controls, plus site-specific hazards.

Risk matrix and hierarchy of controls

So every risk is rated the same way and controls are chosen in the right order.

Sign-off, consultation and instructions

Worker sign-on, consultation record and a one-page instruction sheet.

HOW TO USE IT

How to fill in a SWMS, step by step

1

Fill in the job details

Your business, the project, the client or principal contractor, and the site.

2

Record what the job needs

PPE, plant and equipment, materials, licences and training.

3

Tick the high risk work

Mark every high risk construction work category that applies.

4

Assess each step

List the job steps, the hazards in each, and rate the risk with the matrix.

5

Set the controls

Work down the hierarchy of controls, then re-rate the risk.

6

Consult, brief and sign off

Prepare it with the workers, explain it before work starts, and have everyone sign on.

7

Monitor and review

Check the controls are working and update the SWMS if the job, site or crew changes.

SWMS examples: one job step from three different trades

TRADE

Roofing
High risk construction work

JOB STEP

Fix roof sheets near the edge of a single-storey roof

HAZARD

Falling more than 2 metres from the roof edge

RISK BEFORE

Very High (15)
Possible (3) x Substantial (5)

CONTROLS

Perimeter edge protection installed and inspected before work starts. Access by scaffold stair, not a ladder. No one works outside the edge protection. Exclusion zone below the work area.

RISK AFTER

High (5)
Rare (1) x Substantial (5)

RESPONSIBLE

Site supervisor

TRADE

Commercial cleaning
Requested by the client

JOB STEP

Clean washrooms using chemical cleaning products

HAZARD

Chemical splashes to eyes and skin, and toxic fumes if products are mixed

RISK BEFORE

Very High (12)
Likely (4) x Moderate (3)

CONTROLS

Use pre-diluted products from a dispensing system. Never mix chemicals. SDS available on the cleaning trolley. Ventilate the room. Chemical-resistant gloves and eye protection.

RISK AFTER

Low (4)
Unlikely (2) x Minor (2)

RESPONSIBLE

Cleaning team leader

TRADE

Gardening and grounds
Requested by the council

JOB STEP

Trim grass with a brushcutter next to a public footpath

HAZARD

Stones and debris thrown at passers-by or the operator, and noise

RISK BEFORE

Very High (12)
Likely (4) x Moderate (3)

CONTROLS

Clear stones and rubbish first. Set up an exclusion zone with signs. Stop cutting when anyone approaches. Debris guard fitted. Face shield, hearing protection and long clothing.

RISK AFTER

Low (4)
Unlikely (2) x Minor (2)

RESPONSIBLE

Crew leader

A Substantial consequence never rates below High on the matrix, so the roofing step stays High (5) even with good controls. Its score of 5 sits in the acceptable range, but it's a prompt to keep checking the controls. The cleaning and gardening jobs aren't high risk construction work, but a SWMS is a common way to document them when a client asks.

THE RISK MATRIX

How the 5 x 5 risk matrix works

Score how likely harm is (1 to 5, down the side) and how serious it could be (1 to 5, across the top). Multiply them, and the cell where they meet gives the risk level. Rate each step twice: before controls and after.

 

Negligible (1)

Minor (2)

Moderate (3)

Major (4)

Substantial (5)

Almost certain (5)

Low
5

Moderate
10

Very High
15

Extreme
20

Extreme
25

Likely (4)

Low
4

Moderate
8

Very High
12

Very High
16

Extreme
20

Possible (3)

Low
3

Moderate
6

High
9

Very High
12

Very High
15

Unlikely (2)

Low
2

Low
4

High
6

High
8

Very High
10

Rare (1)

Low
1

Low
2

Moderate
3

High
4

High
5

 1 to 6: Acceptable  Proceed with the controls in place and confirm they're working.

 7 to 10: Acceptable with strict controls or short duration  Review the controls and add further reasonably practicable controls before work proceeds.

 11 to 25: Unacceptable  The work doesn't start, or stops, until further controls reduce the risk.

CHOOSING CONTROLS

Use the hierarchy of controls

Start at the top and only move down when the control above isn't reasonably practicable. Most risks end up with a combination.

MOST EFFECTIVE

1. Eliminate

Remove the hazard altogether, so far as is reasonably practicable

▼

2. Minimise: one or a combination of these (same level)

Substitute

Swap for something safer

Isolate

Separate people from the hazard

Engineering

Change plant or processes

▼

3. Administrative controls

Procedures, training, signage and supervision for the risk that remains

▼

4. PPE

Personal protective equipment, last, for whatever risk is left

LEAST EFFECTIVE

BLANK OR PRE-FILLED?

Free blank SWMS or a pre-filled SWMS?

Both use the same layout. The difference is who writes the steps, hazards and controls.

Free blank SWMS

Pre-filled SWMS

Layout, checklists and matrix

✓

✓

Job steps, hazards and controls

You write them

Already written for the task

Risk ratings

You rate them

Rated before and after controls

Best for

Unusual tasks, or if you're confident writing your own

Getting on site sooner, and tasks you do often

Still to do either way

Check it against the job and site, add your details, consult your workers and sign it off

Get the free SWMS template

Editable Word document with the high risk construction work checklist, risk matrix and step-by-step instructions. Your download link is emailed straight away.

✓ 100% free · ✓ Add your logo · ✓ Suits every state and territory

How the free checkout works
Add the template to your cart and check out for $0. No payment details are required. Your download link arrives by email straight away.

SKIP THE BLANK PAGE

Want the steps, hazards and controls already written?

Our pre-filled SWMS use this same layout, with the job steps, hazards, controls and risk ratings written for the task. Check them against your site, add your details and get started.

Single SWMS

One task, pre-filled and ready to edit in Word.

BEST VALUE

Industry SWMS bundles

Every SWMS your trade does or supervises, in one download, for about the cost of a few single SWMS.

WHS Management Systems

The full SWMS bundle for your trade, plus your WHS manual, SOPs and toolbox talks.

Pay once, no subscription · 30-day money back guarantee · Acceptance Guarantee for 12 months · 12 months free support and updates

FAQS

Free SWMS template: common questions

bottom of page