Building & Construction Safe Work Method Statements (SWMS) Value Pack
Introduction:
The Building & Construction SWMS Value Pack is specifically designed for businesses within the building and construction industry. This comprehensive package offers 44 fully customisable SWMS templates that cover everything from routine tasks to high-risk activities, enabling your business to more effectively document common hazards and safety controls. These templates can be seamlessly integrated into your Workplace Health and Safety (WHS) management systems and customised to meet the specific needs of your business operations, enhancing safety management.
SWMS Included in the Pack:
- Air Compressor
- Building Site Cleans
- Angle Grinder
- Asbestos Exposure
- Brick Saw
- Cement Mixer
- Chemicals
- Circular Saw
- Concrete Nail Gun
- Concreting
- Confined Space Entry
- Covid 19
- Drill Press
- Driving a Vehicle
- Electrical Work
- Elevated Work Platforms (EWP)
- Excavator
- Fuel Storage, Refuelling, and Decanting
- General Plant
- Hand, Air & Power Tools
- Heavy Lifting Using Forklift, Jibs, and Sling
- High Risk Construction Work (HRCW)
- Hot Works
- Ladder
- Manual Handling
- Mechanical Lifting
- Mobile Plant
- Painting
- Plastic Duct Installation
- Plumbing & Drainage Work, Roof Repairs
- Site Safety (General)
- Skid Steer
- Slab (Preparation, Pouring & Finishing)
- Tipper
- Trenching & Excavation
- Watercart
- Welding & Cutting
- Wiring
- Working Around Plant & Equipment
- Working Around The Public
- Working at Heights
- Working Outdoors
- Working with Electricity
- Working with Silica
Additional Resources:
With every purchase of the Building & Construction SWMS Value Pack, customers receive a complimentary copy of our Legislation & Codes of Practice Reference List.
Key Features:
The Building & Construction SWMS Value Pack offers a quicker and easier way to document workplace safety processes across a diverse range of construction activities. Designed for rapid customisation and ease of use, these templates help businesses efficiently document their safety practices. Equip your business with the tools it needs to maintain a safe and compliant working environment.
top of page
Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost
Comprehensive WHS Framework
Developed in line with Australian regulations.
​Save Time & Money
Save hours of time &
frustration starting from scratch.
Fully Editable
Supplied as a fully editable Word document.
​2025 Editions
Latest editions available.
$795.00 Regular Price
$495.00Sale Price
GST Included

FREE
Related Products
Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.
bottom of page

















