top of page

Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost

Comprehensive WHS Framework

Developed in line with Australian regulations.

​Save Time & Money

Save hours of time &

frustration starting from scratch.

Fully Editable

Supplied as a fully editable Word document.

​2025 Editions

Latest editions available.

Electrical & HVAC Safe Work Method Statements (SWMS) Value Pack

 

Introduction:

The Electrician & HVAC SWMS Value Pack is an essential collection of templates tailored for professionals in the electrical and heating, ventilation, and air conditioning (HVAC) sectors. This package includes 25 specific SWMS that cover a wide range of activities, from basic manual handling and ladder use to specialised tasks like high voltage work and air conditioner installation. Designed for easy integration into your Workplace Health and Safety (WHS) management systems, these templates are fully customisable, allowing businesses to efficiently document the typical hazards and safety controls relevant to their operations.

 

SWMS Included in the Pack:

  1. Air Conditioner Installation
  2. Alarm & Access Control Installation
  3. Battery Test & Charge
  4. Cable & Ladder Tray Installation
  5. Confined Space Entry
  6. Covid 19
  7. Display & Equipment Installation
  8. Driving a Vehicle
  9. Electrical Work
  10. Elevated Work Platforms (EWP)
  11. High Voltage Work (De-energised)
  12. Installation and Termination of UTP Cabling
  13. Installation of Cable & Fire Equipment
  14. Ladder
  15. Manual Handling
  16. Power Tools
  17. Security, CCTV, and Data Cable Installation
  18. Site Safety (General)
  19. Wiring
  20. Working Around Plant & Equipment
  21. Working Around The Public
  22. Working at Heights
  23. Working from Tower
  24. Working in Private Residences
  25. Working with Electricity

 

Additional Resources:

Included is a complimentary copy of our Legislation & Codes of Practice Reference List.

 

Key Features:

The Electrician & HVAC SWMS Value Pack is designed to be a quick and easy tool for electricians and HVAC technicians to document their WHS systems comprehensively. The templates allow for rapid editing and full customisation to meet specific business requirements, providing a practical solution to managing workplace safety effectively. This value pack equips businesses with the necessary tools to maintain high safety standards while streamlining documentation and enhancing operational efficiency.

Electrical & HVAC Safe Work Method Statements (SWMS) Value Pack

$695.00 Regular Price
$395.00Sale Price
GST Included

We accept the following payment methods:

Custom Branded WHS Manual and Management System.jpg

FREE

What Our Clients Are Saying

Exceptional Service

Delivered exceptional service for our WHS document needs. The documents were highly professional, delivered promptly, and their customer service was excellent. They exceeded our expectations, making the process stress-free and efficient. We highly recommend Everything OHS and will definitely return for future needs. Thank you!”

Luisa Cubito
Urban Demolition

Woman with White Shirt

Impressively Quick

“Very helpful and an impressively quick turnaround for a customised OHS manual. The interaction was seamless, and the provided document is aligned with the current regulations. Very happy, would highly recommend.”

​

​

​

Tracey Colver

CombiTel

Woman in Office

Highly Recommend

“Would highly recommend Everything OHS for your business needs.  We reached out and received a reply straight away.  The service was quick and helpful and very happy to help.”

​

​

​

​

Nadine

Fergs Haulage

 Have You Got A Question?

If you have any questions about our products or your specific needs, please contact our team – we're here to help.

Related Products

Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.

bottom of page