top of page

Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost

Comprehensive WHS Framework

Developed in line with Australian regulations.

​Save Time & Money

Save hours of time &

frustration starting from scratch.

Fully Editable

Supplied as a fully editable Word document.

​2025 Editions

Latest editions available.

Transportation & Warehousing Safe Work Method Statements (SWMS) Value Pack

 

Introduction:

The Transportation and Warehousing SWMS Value Pack is a comprehensive bundle of templates designed to help businesses in the transportation and warehousing sectors document their safety procedures effectively. This value pack comprises 38 detailed SWMS templates that cover a wide range of activities, from general driving and manual handling to specific operations such as rigging, chain blocks, and telehandler forklift operations. These templates are fully customisable, allowing easy integration into your existing Workplace Health and Safety (WHS) management systems.

 

SWMS Included in the Pack:

  1. Chemicals
  2. Cleaning of Vehicles
  3. Confined Space Entry
  4. Driving a Vehicle
  5. Driving in Remote Locations
  6. Elevated Work Platforms (EWP)
  7. Forklift
  8. Fuel Storage, Refuelling, and Decanting
  9. Fuel
  10. General Plant
  11. Hand, Air, and Power Tools
  12. Handling Hazchem
  13. Heavy Lifting Using Forklift, Jibs, and Slings
  14. Ladder
  15. Loading and Unloading Pallets
  16. Loading and Unloading Trucks
  17. Manual Handling
  18. Manual Jack
  19. Manual Tyre Change
  20. Mechanical Lifting
  21. Mobile Plant
  22. Operation of Trucks
  23. Picking Up and Unloading of Skip Bin
  24. Preparation of Load Export Containers
  25. Refuelling Plant and Equipment
  26. Rigging & Chain Blocks
  27. Telehandler Forklift
  28. Tipper
  29. Traffic Control
  30. Traffic Management Sign Setup
  31. Truck Driving (Fatigue)
  32. Truck Driving (Speed)
  33. Truck Driving (General)
  34. Truck Haulage
  35. Truck Mounted Crane
  36. Watercart
  37. Working Around Plant & Equipment
  38. Working Around The Public

 

Additional Resources:

Purchase of the Transportation and Warehousing SWMS Value Pack includes a free copy of our Legislation & Codes of Practice Reference List.

 

Key Features:

This SWMS Value Pack is specifically designed to give transportation and warehousing businesses a range of robust tools for documenting and managing workplace safety. The templates are easy to use and quick to customise, allowing you to tailor them to specific operational needs. Equip your team with this comprehensive package to help ensure a safer working environment.

 

Transportation & Warehousing Safe Work Method Statements Value Pack

$695.00 Regular Price
$395.00Sale Price
GST Included

We accept the following payment methods:

Custom Branded WHS Manual and Management System.jpg

FREE

What Our Clients Are Saying

Exceptional Service

Delivered exceptional service for our WHS document needs. The documents were highly professional, delivered promptly, and their customer service was excellent. They exceeded our expectations, making the process stress-free and efficient. We highly recommend Everything OHS and will definitely return for future needs. Thank you!”

Luisa Cubito
Urban Demolition

Woman with White Shirt

Impressively Quick

“Very helpful and an impressively quick turnaround for a customised OHS manual. The interaction was seamless, and the provided document is aligned with the current regulations. Very happy, would highly recommend.”

​

​

​

Tracey Colver

CombiTel

Woman in Office

Highly Recommend

“Would highly recommend Everything OHS for your business needs.  We reached out and received a reply straight away.  The service was quick and helpful and very happy to help.”

​

​

​

​

Nadine

Fergs Haulage

 Have You Got A Question?

If you have any questions about our products or your specific needs, please contact our team – we're here to help.

Related Products

Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.

bottom of page