This Dingo SWMS (Safe Work Method Statement) is pre-filled and covers operating, loading and transporting a Dingo with its attachments. It sets out 12 activities, from setting up and loading on ramps to refuelling, underground services and emergency response, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Landscapers and garden construction businesses
Fencing and retaining wall contractors
Excavation and earthmoving contractors
Plumbers, irrigation and drainage installers
Plant hire and equipment rental businesses
It also works as a written task risk assessment for any business where workers use a Dingo, the same way you'd use a JSA or Safe Work Procedure.
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Setting up, including site access, materials storage and operator competence
Loading, unloading and ramps, including rollover and crush injuries
Towing or transporting the Dingo between sites
Exclusion zones to keep pedestrians and workers clear when reversing
Attachments, competence and damage to site services
Dust and respirable crystalline silica
Overhead power line no-go zones
Rain, wind and heat causing slips, bogging and poor visibility
Working around other trades, EWPs and deliveries
Refuelling and maintenance, including fire and chemical exposure
Striking underground services and crushing the operator against walls or fences
Emergency response to rollover, collision or injury
What's included
Hazards and control measures for 12 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, including attachments, rated ramps, chocks, UHF radios and a spill kit
Daily pre-start checks for the Dingo and attachments, with tag-out of faulty plant
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for operating a Dingo?
A SWMS is legally required when the job is high risk construction work, for example work in an area with movement of powered mobile plant, trenching deeper than 1.5 metres, or digging near energised underground cables or gas mains. Outside those situations a SWMS isn't mandatory, but you still have to manage the risks, and a SWMS is a sound way to record how. Clients, builders and prequalification portals often ask for one either way.
Does it cover underground services?
Yes. It covers striking a live cable, gas main or water main with the auger or trencher, and the operator being crushed between the machine and a wall, fence, vehicle or trench edge when it reverses.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















