This Concrete Truck SWMS (Safe Work Method Statement) is pre-filled and covers delivering and placing premix concrete with an agitator truck. It sets out 16 activities, from arriving at site and positioning the truck to chute washing, washout and emergency response, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Concrete agitator truck owner-drivers
Premix concrete suppliers and batching plants
Concrete pumping and placing contractors
Concreters and builders receiving pours
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Arriving at site and managing truck and pedestrian movements
Positioning the truck near excavations, uneven ground and overhead power lines
Getting out of the cab without being hit by traffic or slipping
Boom setup, outriggers and placing the boom, including wind and electrical contact
Hopper safety and discharging concrete, including spray from burst elbows
Chute washing and yard clean-up, including falls from access
Removing hardened concrete from the drum as a confined space, including unexpected rotation and silica dust
Reversing and manoeuvring, with people on foot as the main fatality risk
Refuelling with diesel, including spills, vapour and fire
Washout and waste water kept out of drains and soil
Alkaline burns, eye injury and dermatitis from wet concrete
Emergency response to diesel spills, traffic incidents or injury
What's included
Hazards and control measures for 16 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, from wheel chocks and cones to diesel and slurry spill kits
Daily pre-start checks and maintenance for the truck, chutes and equipment, with tag-out of faults
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for operating a concrete truck?
A SWMS is legally required when the job is high risk construction work, and concrete deliveries to construction sites often are, for example work in an area with movement of powered mobile plant, or work next to a road in use. Outside those situations a SWMS isn't mandatory, but you still have to manage the risks, including drum entry, which is confined space work, and a SWMS is a sound way to record how. Builders and head contractors usually ask for one.
Does it cover entering the drum to remove hardened concrete?
Yes. It treats the mixing drum as a confined space, covering asphyxiation, engulfment and entrapment, unexpected drum rotation while someone is inside or reaching in, and silica dust when knocking off residue.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















