This Multi-Piece and Split Rim Wheel Servicing SOP (Safe Operating Procedure) gives tyre fitters a clear method for deflating, demounting, inspecting, assembling and inflating two-piece divided wheels, bolted split rims and lock ring rims on trucks, buses, trailers, forklifts, mobile cranes and farm machinery. It covers full deflation before any fastener is touched, matching components to the rim chart, tubes and flaps, solid and foam-filled tyres, and seating and inflating in a restraint cage. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Truck, bus and fleet tyre fitters
Tyre retailers and mobile tyre services
Forklift and mobile crane service technicians
Agricultural machinery dealers and farm workshops
Fleet and plant maintenance workshops
Use it to
Train and induct workers in exactly how you expect the task to be done
Keep a clear reference in the workshop, the service vehicle or on site
Record competency with the built-in sign-off
Show clients, insurers and auditors your safe work methods are written down
What this SOP covers
Explosive separation of lock rings, side rings and rim components
Divided wheel clamping bolts mistaken for wheel nuts
Dual wheels where the outer wheel holds a damaged inner wheel together
Cracked, corroded, worn or mismatched rim components
Solid, press-on and foam-filled tyres, liquid ballast, and tubes and flaps
Heat-affected tyres and pyrolysis
Vehicle movement and support, manual handling, noise and compressed air
What's included
11 pre-operational checks
A 16-step operating procedure
Isolation and energy control for tyre pressure, the vehicle and the raised load
6 shutdown, housekeeping and post-operation steps
Emergency actions for rim movement during inflation, heat-affected tyres and cage failures
PPE checklist and a list of related documents
Competency acknowledgement and worker sign-off
Space for your logo, SOP number, version and review dates
Why use this template
Saves hours compared with writing an SOP from a blank page
Written as clear, numbered steps that workers can follow on the job
Fully editable, so you can match it to your equipment, site and how your team works
The competency sign-off gives you a training record from day one
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, company name, SOP number and dates.
Check it suits your equipment and site, and edit anything you need to.
Train your workers and have them sign the competency acknowledgement.
Need more than one SOP?
This SOP is also included in the Ultimate Automotive & Mechanical SOP Bundle and the Ultimate Transport & Warehousing SOP Bundle. At $197 for a whole bundle, it works out much cheaper than buying SOPs one at a time.
Common questions
Does it cover earthmoving wheels?
No. It covers rims under 24 inches nominal diameter. Earthmoving and OTR wheels of 24 inches (600 mm) and above are covered by our Earthmoving & OTR Multi-Piece Wheel Servicing SOP.
Does it give inflation pressures and torques?
No. Pressures, seating pressures and torques always come from the rim, tyre or vehicle manufacturer, so the SOP points workers to those figures.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any step, check or hazard, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.























