This Cable Pulling in Ceiling & Wall Spaces SOP (Safe Operating Procedure) covers safely getting into, moving through and working in ceiling spaces, roof voids and wall cavities to pull data and power cabling. It covers asbestos checks, isolating all supplies including solar and batteries, moving only on load-bearing members, avoiding live services, heat stress, insulation contact and handling cable reels. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Electricians and electrical contractors
Data and communications cablers
Security and CCTV installers
Audio visual and home theatre installers
Solar and antenna installers
Use it to
Train and induct workers in exactly how you expect the task to be done
Keep a clear reference at the machine, in the vehicle or on site
Record competency with the built-in sign-off
Show clients, insurers and auditors your safe work methods are written down
What this SOP covers
Falling through ceiling sheeting or plasterboard
Electric shock or arc flash from existing live wiring
Heat stress and dehydration in hot roof spaces
Restricted movement and difficult exit from tight spaces
Skin, eye and breathing irritation from insulation and dust
Manual handling of cable reels and drums
Trips and being struck by protruding fixings and sharp edges in poor light
Asbestos fibres from disturbed ceiling, eave or wall materials
What's included
7 pre-operational checks, from asbestos and existing services to access ladders, lighting, a check-in person and cable reels
A 10-step operating procedure covering access, load-bearing members, avoiding live cabling, cable routing, reel handling, heat and insulation
Isolation and energy control for identifying every supply, including solar, batteries and generators, lock out, tag and testing
6 shutdown, housekeeping and post-operation steps
Emergency actions for heat stress, electric shock, fall-through, collapse and suspected asbestos disturbance
PPE checklist and a list of related documents
Competency acknowledgement and worker sign-off
Space for your logo, SOP number, version and review dates
Why use this template
Saves hours compared with writing an SOP from a blank page
Written as clear, numbered steps that workers can follow on the job
Fully editable, so you can match it to your equipment, site and how your team works
The competency sign-off gives you a training record from day one
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, company name, SOP number and dates.
Check it suits your equipment and site, and edit anything you need to.
Train your workers and have them sign the competency acknowledgement.
Need more than one SOP?
This SOP is also included in the Ultimate Electrical, HVAC & Solar SOP Bundle. At $197 for the whole bundle, it works out much cheaper than buying SOPs one at a time.
Common questions
Does it cover the electrical wiring and testing?
No. It covers safe access and working in the void while pulling cable. Wiring, termination and testing are covered by your electrical work procedures.
Does it deal with solar and battery systems?
Yes. Before entering a domestic roof space, workers identify every supply, including grid, solar, battery storage and generators, isolate, lock out, tag and test. Anything still energised is treated as live.
What if asbestos is suspected?
Stop work and don't disturb the material further. The SOP says to report it and follow your Asbestos Management procedure.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any step, check or hazard, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















