top of page

Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost

Comprehensive WHS Framework

Developed in line with Australian regulations.

​Save Time & Money

Save hours of time &

frustration starting from scratch.

Fully Editable

Supplied as a fully editable Word document.

​2026 Editions

Latest editions available.

This High Voltage Work (de-energised) Risk Assessment/JSA (Job Safety Analysis) is pre-filled and covers removing, installing and maintaining de-energised HV overhead equipment under isolation and access permits. It sets out 8 activities, from pre-planning to post-work handover and emergency response, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.

 

Who it's for

  • Electrical contractors working on HV networks

  • Overhead line and powerline contractors

  • Utility and asset maintenance contractors

  • Electrical contractors working on mine sites

  • Solar farm and infrastructure electrical contractors

A risk assessment, also called a JSA, JSEA or task risk assessment, records the hazards of a task and how you control them. If the task is part of high risk construction work, the law requires a SWMS for that work, so use our High Voltage Work (de-energised) SWMS instead.

 

Use it to

  • Show clients, insurers and auditors how you manage the risks

  • Apply for tenders, contracts and supplier panels

  • Get through prequalification with Avetta, Cm3 and other contractor portals

  • Induct new workers and train them in the task

 

What this risk assessment covers

  • Pre-planning for skills, competency and faulty equipment

  • Setting up the workplace, including PPE, fitness for work and manual handling

  • Isolation and access permits, with clear work boundaries for the work party

  • Keeping to minimum approach distances

  • Removing, installing and maintaining de-energised overhead equipment

  • Testing before touching, working at height and vehicle movement

  • Site clean-up, including contact with live apparatus and unstable ground

  • Oil leaks, damaged insulation materials and waste

  • Post-work handover to prevent unauthorised re-energisation

  • Emergency response to electric shock, induced voltage, fire or serious injury

 

What's included

  • Hazards and control measures for 8 work activities

  • Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls

  • PPE requirements checklist

  • Licence requirements, including an electrical licence and a current HV switching and access authority

  • Low voltage rescue and CPR, plus working at heights and EWP competency where needed

  • Site specific hazards section for anything unique to your job

  • Further controls action plan to track anything still to be done

  • Worker sign-off sheet and worker consultation record

 

Why use this template

  • Saves hours compared with writing a risk assessment from a blank page

  • Covers the most common hazards and control measures for this work, ready to use out of the box

  • Fully editable, so you can add, remove or change anything to suit your workplace and how your team works

  • Helps your business stay compliant, with risk ratings, an action plan, worker sign-off and consultation records already set up

  • Comes with a step-by-step implementation guide

 

How it works

  1. Buy online and download straight away. You'll also get an email with your link.

  2. Add your logo, ABN, area and site details.

  3. Check it suits your workplace and task, edit anything you need to, and consult your workers before you finalise it.

  4. Brief your team and collect signatures.

 

Common questions

Do I need a SWMS or a risk assessment for de-energised high voltage work?

A SWMS is legally required when the job is high risk construction work, and HV work often is: work near energised electrical installations or services, a fall risk of more than 2 metres from poles or EWPs, or movement of powered mobile plant. Even where the equipment you're working on is de-energised, a SWMS is a sound way to record your isolation, testing and permit controls. Network operators, clients and prequalification portals often ask for one. If the job is high risk construction work, use our High Voltage Work (de-energised) SWMS instead.

Does it include the authorisations needed?

Yes. It lists an electrical licence for the relevant state or territory, a current high voltage switching and access authority from the network operator or asset owner, authorisation as the access permit recipient, and current low voltage rescue and CPR.

Can I change it?

Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.

Does it suit my state?

Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.

What if it doesn't suit my work?

You're covered by our 30-day money-back guarantee if it isn't fit for purpose.

Risk Assessment/JSA - High Voltage Work (de-energised)

$69.95Price
GST Included

We accept the following payment methods:

Custom Branded WHS Manual and Management System.jpg

FREE

What Our Clients Are Saying

Exceptional Service

Delivered exceptional service for our WHS document needs. The documents were highly professional, delivered promptly, and their customer service was excellent. They exceeded our expectations, making the process stress-free and efficient. We highly recommend Everything OHS and will definitely return for future needs. Thank you!”

Luisa Cubito
Urban Demolition

Woman with White Shirt

Impressively Quick

“Very helpful and an impressively quick turnaround for a customised OHS manual. The interaction was seamless, and the provided document is aligned with the current regulations. Very happy, would highly recommend.”

​

​

​

Tracey Colver

CombiTel

Woman in Office

Highly Recommend

“Would highly recommend Everything OHS for your business needs.  We reached out and received a reply straight away.  The service was quick and helpful and very happy to help.”

​

​

​

​

Nadine

Fergs Haulage

 Have You Got A Question?

If you have any questions about our products or your specific needs, please contact our team – we're here to help.

Related Products

Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.

bottom of page