This 13-page Insulation Safe Work Method Statement (SWMS) provides the typical safety controls and possible hazards associated with the safe installation and handling of insulation materials.
Developed by WHS experts, this SWMS is pre-filled, ready to use, and aligned with Australian WHS legislation. It helps you meet your WHS obligations, manage risks effectively, and maintain compliance on site.
The template is suitable for all Australian states and territories and comes in an editable Microsoft Word format, making it easy to customise with your company name, logo, and site-specific details.
Who This SWMS Is For
This SWMS is ideal for:
Building and construction companies
Residential and commercial insulation installers
HVAC and ducting contractors
Warehousing and logistics businesses handling insulation materials
Property maintenance and refurbishment services
Manufacturing and fit-out companies
What This SWMS Covers
This SWMS includes detailed safety procedures, risk assessments, and control measures for insulation installation, including:
Site Establishment & Preparation
Setting up work areas and unloading materials safely
Clear walkways and pathways to prevent slips, trips, and falls
Manual Handling & Lifting Techniques
Correct lifting procedures to prevent back strain and impact injuries
Team lifts, trolleys, and mechanical aids for heavy insulation packs
Dust, Fibre & Airborne Hazard Controls
Handling sealed insulation packs to reduce exposure
Use of P2 masks, respirators, gloves, and long-sleeved protective clothing
Working at Heights (High-Risk Work)
Use of harnesses, fall arrest systems, scaffolds, and elevated platforms
Exclusion zones and signage to prevent dropped-object injuries
Use of Tools, Drills, and Grinders
Safe handling of power tools, including RCD-protected equipment
Dust extraction systems and PPE for eye, ear, and respiratory protection
Hazardous Substances & Adhesives
Safe handling of adhesives and solvents using SDS-compliant procedures
Fire risk management in enclosed or poorly ventilated areas
Housekeeping & Waste Management
Bagging offcuts and dust to prevent fibre spread
Environmental controls to prevent contamination
Equipment Inspections & Maintenance
Pre-start equipment checks and “out of service” tagging for defective tools
Emergency Response Procedures
Location of first aid kits, firefighting equipment, and muster points
Step-by-step instructions for responding to incidents or injuries
What’s Included in Your Template
Pre-filled Insulation SWMS
HRCW (High-Risk Construction Work) selection table
Detailed risk assessment matrix and risk rating calculator
Step-by-step procedures and safety controls
List of possible hazards and recommended control measures
PPE requirements specific to insulation installation
Plant and equipment checklist
References to relevant legislation, regulations, and codes of practice
Worker sign-off sheet
This SWMS template for Insulation Installation is an essential tool for documenting your WHS systems quickly and effectively. Designed for easy editing and customisation, it adapts seamlessly to your operational needs - making it an invaluable part of your safety management toolkit.
Perfect for tenders, safety audits, and day-to-day operations, this template saves you time and helps ensure your business remains safe, compliant, and protected.
Get your Insulation SWMS today and start using it instantly!
Insulation SWMS
We accept the following payment methods:
➡️ Pre-filled and ready to use
➡️ Created by WHS experts, aligned with Australian WHS legislation
➡️ Suitable for all Australian states and territories
➡️ Fully editable Microsoft Word format
➡️ Instant delivery via email
➡️ Free list of relevant legislation & codes of practice (valued at $19.95)
➡️ Easy customisation instructions included
➡️ Pay once, use it as many times as you need
➡️ 12 months free phone and email support


















