This Commercial Installation of Ducted Air Conditioning SWMS (Safe Work Method Statement) is pre-filled and covers installing fan coil units, condensers, fans, ductwork and pipework on commercial jobs. It sets out 12 activities, from site establishment to commissioning, refrigerant charging and demobilisation, with the hazards, control measures and risk ratings before and after controls for each. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.
Who it's for
Commercial air conditioning and HVAC contractors
Mechanical services and ductwork installers
Refrigeration and air conditioning mechanics
Electrical contractors connecting HVAC plant
Builders managing commercial fit-outs
Use it to
Hand clients and principal contractors the SWMS they ask for
Apply for tenders and new jobs with your safety paperwork ready
Get through prequalification with Avetta, Cm3 and other contractor portals
Induct new workers and run toolbox talks on the task
What this SWMS covers
Site establishment and unloading tool boxes, plant and equipment
Unloading at height and around mobile plant, including dropped objects
Marking out plant, ductwork and pipework locations
Crane lifts and mechanical equipment lifters, including falling loads and crush injuries
Installing plant, ductwork, pipework and cable ladders at height and on roofs
Drop saws, drills and rod cutters, including cuts, electrocution, eye injury and entanglement
Oxy-acetylene work, including burns, fire, flashback and asphyxiation
Sealant exposure to people and the environment
Respirable crystalline silica when cutting or drilling masonry, concrete or Hebel panels
Connecting electrical to switchboards, including electrocution and electrical fire
Commissioning, leak testing and charging refrigerant, including frostbite and asphyxiation
Demobilising and emergency response to refrigerant leaks, fire or injury
What's included
Hazards and control measures for 12 work activities
Risk ratings before and after controls, with a 5x5 risk matrix and the hierarchy of controls
PPE requirements checklist and high risk construction work checklist
Plant and equipment list, from scissor lifts and cranes to dust extraction and vacuum pumps
Relevant Australian Standards, including AS/NZS 1891 for fall-arrest systems and AS/NZS 5601 for gas installations
Licences needed, including high risk work, electrical and work at height qualifications
Site specific hazards section for anything unique to your job
Worker sign-off sheet and worker consultation record
Why use this template
Saves hours compared with writing a SWMS from a blank page
Covers the most common hazards and control measures for this work, ready to use out of the box
Fully editable, so you can add, remove or change anything to suit your site and how your team works
Helps your business stay compliant, with risk ratings, worker sign-off and consultation records already set up
How it works
Buy online and download straight away. You'll also get an email with your link.
Add your logo, ABN, project and site details.
Check it suits your site and task, edit anything you need to, and consult your workers before you finalise it.
Brief your team and collect signatures.
Common questions
Do I need a SWMS for commercial ducted air conditioning installation?
A SWMS is legally required when the job is high risk construction work, and commercial ducted installs often are, for example roof and ceiling work where someone could fall more than 2 metres, work on or near refrigerant lines, or work near energised electrical installations. Outside those situations a SWMS isn't mandatory, but you still have to manage the risks, and a SWMS is a sound way to record how. Head contractors and prequalification portals usually ask for one.
Does it include the licence requirements?
It lists the qualifications for the work, including a high risk work licence, electrical workers and contractors licences, mechanical plumbers and work at height qualifications. Crane lifts and work at height are flagged as high risk work in the activity rows.
Can I change it?
Yes. It's a Microsoft Word file, so you can add, remove or change any hazard, control or rating, and add your own logo and details.
Does it suit my state?
Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.
What if it doesn't suit my work?
You're covered by our 30-day money-back guarantee if it isn't fit for purpose.


















