top of page

Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost

Comprehensive WHS Framework

Developed in line with Australian regulations.

​Save Time & Money

Save hours of time &

frustration starting from scratch.

Fully Editable

Supplied as a fully editable Word document.

​2026 Editions

Latest editions available.

This Mobile Scaffold Erection & Inspection SOP (Safe Operating Procedure) gives your team a clear, step-by-step method for erecting, inspecting, using and dismantling wheeled mobile aluminium scaffold towers. It covers ground and component checks, base-to-height ratios and outriggers, building the tower from the inside, guardrails and toe boards, locking castors, moving the tower safely and inspection tagging before each use. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.

 

Who it's for

  • Painters and decorators

  • Electricians and data cablers

  • Ceiling, plastering and partition contractors

  • Builders and maintenance contractors

  • Shopfitters and fit-out crews

  • Facility and building maintenance teams

 

Use it to

  • Train and induct workers in exactly how you expect the task to be done

  • Keep a clear reference at the machine, in the vehicle or on site

  • Record competency with the built-in sign-off

  • Show clients, insurers and auditors your safe work methods are written down

 

What this SOP covers

  • Falls from the working platform or during erection and dismantling

  • Overturning or collapse from an incorrect base-to-height ratio or missing outriggers

  • Uncontrolled movement from faulty castors or castors left free to roll

  • Incomplete guardrails, mid-rails or toe boards

  • Being struck by falling tools, materials or scaffold components

  • Structural failure from damaged, cracked or incompatible frames, braces or decks

  • Crush and pinch injuries during assembly, dismantling or moving

  • Overloading the platform beyond its rated safe working load

  • Contact with overhead powerlines

  • Uneven, sloped, soft or unstable ground

 

What's included

  • 8 pre-operational checks, from the scaffolding licence and component inspection to ground conditions, base-to-height ratio and the inspection tag

  • A 13-step operating procedure covering base assembly, bracing, building from inside, guardrails, internal access, load limits and relocating the tower

  • Isolation and energy control for locking castors and brakes and tagging out damaged components

  • 7 shutdown, housekeeping and post-operation steps

  • Emergency actions for an overturned or collapsed scaffold, a vehicle strike or a fall from the tower

  • PPE checklist and a list of related documents

  • Competency acknowledgement and worker sign-off

  • Space for your logo, SOP number, version and review dates

 

Why use this template

  • Saves hours compared with writing an SOP from a blank page

  • Written as clear, numbered steps that workers can follow on the job

  • Fully editable, so you can match it to your equipment, site and how your team works

  • The competency sign-off gives you a training record from day one

 

How it works

  1. Buy online and download straight away. You'll also get an email with your link.

  2. Add your logo, company name, SOP number and dates.

  3. Check it suits your equipment and site, and edit anything you need to.

  4. Train your workers and have them sign the competency acknowledgement.

 

Need more than one SOP?

This SOP is also included in the Ultimate Bricklaying & Masonry SOP Bundle, Ultimate Building & Construction SOP Bundle, Ultimate Carpentry SOP Bundle and Ultimate Painting SOP Bundle. Each bundle is $197, which works out much cheaper than buying SOPs one at a time.

 

Common questions

Does it cover fixed or static scaffolding?

No. It covers wheeled mobile aluminium scaffold towers only. Fixed, suspended and cantilevered scaffolding and trestle-and-plank platforms aren't covered.

Does it include licence requirements?

Yes. Where there's a risk of a person or object falling more than 4 metres from the scaffold, the SOP states the work must only be erected, altered or dismantled by someone holding a High Risk Work (scaffolding) licence.

Do I still need a SWMS for scaffold work?

Possibly. This SOP sets out how to erect and use a mobile tower safely and supports training and sign-off. If the work is also high risk construction work, you'll need a SWMS for the job as well.

Can I change it?

Yes. It's a Microsoft Word file, so you can add, remove or change any step, check or hazard, and add your own logo and details.

Does it suit my state?

Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.

What if it doesn't suit my work?

You're covered by our 30-day money-back guarantee if it isn't fit for purpose.

Mobile Scaffold Erection & Inspection SOP

$19.95Price
GST Included

We accept the following payment methods:

Custom Branded WHS Manual and Management System.jpg

FREE

What Our Clients Are Saying

Exceptional Service

Delivered exceptional service for our WHS document needs. The documents were highly professional, delivered promptly, and their customer service was excellent. They exceeded our expectations, making the process stress-free and efficient. We highly recommend Everything OHS and will definitely return for future needs. Thank you!”

Luisa Cubito
Urban Demolition

Woman with White Shirt

Impressively Quick

“Very helpful and an impressively quick turnaround for a customised OHS manual. The interaction was seamless, and the provided document is aligned with the current regulations. Very happy, would highly recommend.”

​

​

​

Tracey Colver

CombiTel

Woman in Office

Highly Recommend

“Would highly recommend Everything OHS for your business needs.  We reached out and received a reply straight away.  The service was quick and helpful and very happy to help.”

​

​

​

​

Nadine

Fergs Haulage

 Have You Got A Question?

If you have any questions about our products or your specific needs, please contact our team – we're here to help.

Related Products

Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.

bottom of page