top of page

Every Purchase Backed by 12 Months of Phone & Online Support and Updates — No Extra Cost

Comprehensive WHS Framework

Developed in line with Australian regulations.

​Save Time & Money

Save hours of time &

frustration starting from scratch.

Fully Editable

Supplied as a fully editable Word document.

​2026 Editions

Latest editions available.

This Ceiling Space Cabling SOP (Safe Operating Procedure) covers accessing ceiling spaces and roof voids to run, install or retrieve audio visual, data or low voltage cabling. It covers hatch and ladder checks, confined space assessment, isolating every supply with a licensed electrician, moving only on load-bearing members, keeping clear of wiring and transformers, heat stress, check-ins and closing up afterwards. It's written by WHS specialists, aligned to Australian WHS legislation, and fully editable in Microsoft Word.

 

Who it's for

  • Audio visual installers

  • Data and communications cablers

  • Security, alarm and CCTV installers

  • Home automation and theatre installers

  • Antenna and NBN installers

 

Use it to

  • Train and induct workers in exactly how you expect the task to be done

  • Keep a clear reference at the machine, in the vehicle or on site

  • Record competency with the built-in sign-off

  • Show clients, insurers and auditors your safe work methods are written down

 

What this SOP covers

  • Falling through ceiling tiles, plasterboard or insulation

  • Falls at an unprotected access hatch, manhole or ceiling opening

  • Cramped spaces limiting movement, posture and escape

  • Heat stress and dehydration in hot roof cavities

  • Dust, fibres and loose-fill or batt insulation

  • Electric shock or burns from live wiring, light fittings or transformers

  • Strain and cuts from low clearance, sharp edges and exposed fixings

  • Delayed rescue when working alone or out of sight

 

What's included

  • 7 pre-operational checks, from the access hatch and confined space assessment to locating joists and wiring, heat, a check-in person and ladders

  • A 9-step operating procedure covering entry, load-bearing members, three points of contact, keeping clear of wiring, cable fixing and breaks

  • Isolation and energy control for identifying every supply, de-energising through a licensed electrician, and treating solar as live

  • 6 shutdown, housekeeping and post-operation steps

  • Emergency actions for feeling unwell or trapped, electric shock, fall-through and structural collapse

  • PPE checklist and a list of related documents

  • Competency acknowledgement and worker sign-off

  • Space for your logo, SOP number, version and review dates

 

Why use this template

  • Saves hours compared with writing an SOP from a blank page

  • Written as clear, numbered steps that workers can follow on the job

  • Fully editable, so you can match it to your equipment, site and how your team works

  • The competency sign-off gives you a training record from day one

 

How it works

  1. Buy online and download straight away. You'll also get an email with your link.

  2. Add your logo, company name, SOP number and dates.

  3. Check it suits your equipment and site, and edit anything you need to.

  4. Train your workers and have them sign the competency acknowledgement.

 

Need more than one SOP?

This SOP is also included in the Ultimate Audio Visual SOP Bundle. At $197 for the whole bundle, it works out much cheaper than buying SOPs one at a time.

 

Common questions

Does it cover mains electrical work?

No. Any work on mains wiring must be done by a licensed electrician. This SOP is for audio visual, data and low voltage cabling.

Who de-energises the building before entry?

A licensed electrician. Workers arrange for the installation to be de-energised at the main switch, locked out, tagged and confirmed de-energised, and treat anything still energised, such as solar, as live.

Does it cover floor-level cable runs?

No. Floor-level cable management and trip hazard controls are covered by a separate procedure.

Can I change it?

Yes. It's a Microsoft Word file, so you can add, remove or change any step, check or hazard, and add your own logo and details.

Does it suit my state?

Yes. It's written to the model WHS laws and suits all states and territories, including Victoria under the OHS Act and Regulations.

What if it doesn't suit my work?

You're covered by our 30-day money-back guarantee if it isn't fit for purpose.

Ceiling Space Cabling SOP

$19.95Price
GST Included

We accept the following payment methods:

Custom Branded WHS Manual and Management System.jpg

FREE

What Our Clients Are Saying

Exceptional Service

Delivered exceptional service for our WHS document needs. The documents were highly professional, delivered promptly, and their customer service was excellent. They exceeded our expectations, making the process stress-free and efficient. We highly recommend Everything OHS and will definitely return for future needs. Thank you!”

Luisa Cubito
Urban Demolition

Woman with White Shirt

Impressively Quick

“Very helpful and an impressively quick turnaround for a customised OHS manual. The interaction was seamless, and the provided document is aligned with the current regulations. Very happy, would highly recommend.”

​

​

​

Tracey Colver

CombiTel

Woman in Office

Highly Recommend

“Would highly recommend Everything OHS for your business needs.  We reached out and received a reply straight away.  The service was quick and helpful and very happy to help.”

​

​

​

​

Nadine

Fergs Haulage

 Have You Got A Question?

If you have any questions about our products or your specific needs, please contact our team – we're here to help.

Related Products

Important Disclaimer: All products are provided under licence for your internal business use only and are not legal advice. It is your responsibility to ensure the product is suitable for your intended purpose. We recommend obtaining independent professional advice before use. By purchasing or downloading, you agree to our Terms & Conditions. Australian Consumer Law rights apply.

bottom of page